Reports

Residual Waste Infrastructure Review (8th Issue)

The latest update to the Eunomia Residual Waste Infrastructure Review was issued on 22nd June 2015.

Eunomia’s Eighth Residual Waste Infrastructure Review, out today, shows that the UK remains on track to exceed the required level of residual waste treatment capacity by 2019/20 (or by 2018/19 when export of RDF is included).

The report draws upon data from local authorities’ annual WasteDataFlow returns, Defra’s latest C&I data and Eunomia’s in-house Facilities Database, which holds information on all residual treatment facilities in the UK (both operating and under development). Data is analysed on both a national and regional basis, to provide a detailed picture of where insufficient or excess capacity is anticipated.

The report focuses entirely on waste which is suitable for treatment by residual treatment plant, including incinerators, mechanical-biological treatment (MBT) facilities, and gasifiers, but excludes C&D and other unsuitable wastes which have been included in some other estimates of national capacity requirements.

Download the report
You may also like
Circular Economy 
8 May 2025
Milestone study on bioplastics waste management in the US and Canada
Photo by tanvi sharma on Unsplash
Circular Economy 
8 May 2025
Milestone study on plastics waste management in the US and Canada

Set a Password

Please choose a strong password before unlinking your account.

If you have an account, your password will be requested.